West Vancouver, BC
House Painters in West Vancouver
West Vancouver homes ask a lot of paint: big glass, long cedar walls, deep overhangs and rain off the North Shore mountains. From West Coast modern post-and-beam houses in the lower neighbourhoods to larger homes in the British Properties, we paint interiors and exteriors and finish drywall to the standard these houses deserve.
Updated November 2026
West Coast modern homes
Post-and-beam houses from the 1950s and 60s mix exposed wood, cedar siding and walls of glass. Cedar needs the right primer and coating, and there's a lot of careful masking around glazing and beams. Rushed prep shows quickly on these houses.
Larger homes on the slopes
Homes in the British Properties and Chartwell often have tall entries, high ceilings and long sightlines, where a Level 5 skim and a perfectly cut ceiling line make the difference. Exteriors are often big and high, so access and scheduling get planned before the first day.
Wet, shaded north walls
Mountain-side lots stay damp and shaded. Moss and mildew are washed and treated before painting, and bare edges are primed so water can't get behind the finish.
What does painting cost in West Vancouver?
| Interior painting with ceilings and trim (Canada, 2026) | $3–$5 per sq ft |
| Exterior painting project, Vancouver average | about $5,290 |
| Drywall project, Vancouver average | about $3,455 |
| Popcorn removal, skim coat and repaint (Metro Vancouver) | $6–$12+ per sq ft |
Published figures (CAD) from HomeStars and Renoquotes, not our quote. See the Vancouver painting cost guide.
Included on every job
- A free on-site quote, then a written scope and price before any work starts, with the paint system named
- Furniture moved and covered, floors protected wall to wall, every room left broom-clean each day
- Proper prep: filling, sanding, spot-priming and caulking before a drop of colour goes on
- Premium paint lines matched to the surface, applied at the manufacturer's coverage
- Asbestos testing arranged before we disturb texture or drywall in a pre-1990 home (WorkSafeBC)
- Photos at each stage, and a walkthrough with you before the final invoice
A walkthrough before you pay
We walk every room with you in good light. Anything you're not happy with gets touched up before the final invoice.
Services in West Vancouver
West Vancouver questions
Renovating a home built before 1990? WorkSafeBC: asbestos testing before renovation.
